This article, as a case study, deals with the design and implementation of one of the prominent projects of Arta Energy Pasargad, 63.023 kV substation. From the early stages of design to operation, all the innovative aspects and technical challenges encountered in this project are explored. The article deals with the impact of this project on improving the efficiency and increasing the transmission and distribution capacity in the regional energy network, and also takes a look at the future of similar projects in Iran’s energy field.
Designing and supervising the construction and execution of all types of high voltage substations from 63 to 400 kV Description of the activity: 1Basic design and calculations in the ...
Configuring and carrying out FAT and SAT settings and tests, protective shields and DCS system for all types of high voltage substations up to 400 kV level Description of ...
Performing FAULT ANALYZING and presenting solutions for protection systems in high pressure substations and steel complexes and providing solutions Description of the activity: 1INFORMATION RECEPTION AND DISTURBANCE PROTECTION RELAYS2Checking ...
Setting up the upstream feeder of the RO unit located in the MCC of the 6.6 KV transformer reclamation and electrification unit of Jahan Steel Factory in Sirjan ...
(021)44102413
Tehran, Nasser Hijazi Blvd., South Shagaig St., Shayanfar
info@aep-power.com